For Bagged Material
Case Details
Client: Food factory
Goods: All kinds of raw materials for food, such as flour
Picking way: Forklift, pallet
Food raw materials are relatively heavy and are generally used with pallets. When designing a plan, we need to consider the weight of each bag of ingredients and the total weight and height of each tray. The height of the warehouse, the turning radius of the forklift and the ascent height are all important factors in determining the specifications and materials of the shelves.
The big challenge for us in this case is that we need to complete 350 cubic meters of goods within 10 days. At the same time, the task of installing more than 1,000 sets of shelves needs to be completed within 15 days after delivery.
With the joint efforts of more than 300 workers, we not only completed the production plan on time, but also completed the installation task in advance
The customer's evaluation of us is professional, high production efficiency, and rich installation experience.